Grant adequate meeting time to jailed Unitech MD Sanjay Chandra: SC to Tihar Jail authorities

The Supreme Court today directed Tihar Jail authorities to grant adequate meeting time to their inmate Sanjay Chandra, Managing Director Unitech BSE -1.12 % Ltd, for allowing him to strike deals with prospective buyers.

Chandra, head of the embattled real estate group, was recently asked by the apex court to deposit Rs 750 crore with it by December end to safeguard the interests of homebuyers.

A bench of Chief Justice Dipak Misra and Justices A M Khanwilkar and D Y Chandrachud considered the submission of senior advocate Ranjit Kumar that Chandra gets 30 minutes meeting time in jail to deal with prospective buyers and for arranging money.

The apex court had on October 30 said that the jailed businessman will be granted bail only after the real estate group deposits money with its registry by December end.

Today, the senior lawyer said that Chandra has been required to be produced in various courts, consumer forum and commissions on a regular basis which hampered his endeavour to arrange money and hence, the production warrants issued against him by various judicial bodies be stayed for 15 days.

He also said that the accused be allowed to appear in courts through his lawyers. The plea was declined.The apex court, however, clarified that its earlier order directing all courts below not to take any coercive action against the accused for the time being would also be made applicable on all forums including state and national consumer commissions.

It had said if any proceedings were pending against Chandra and the company, those may continue and the final order be passed but no coercive steps would be taken for executing those orders.

Chandra is seeking interim bail from the apex court after the Delhi High Court on August 11 had rejected the plea in a criminal case lodged in 2015 by 158 home buyers of Unitech projects’ — ‘Wild Flower Country’ and ‘Anthea Project’ — situated in Gurugram.

Source – TOI

Maha RERA makes only developer, not land owner, answerable to homebuyers

Maharashtra Real Estate Regulatory Authority (MahaRERA) has withdrawn its office order making land owners equally liable as that of builders and developers

Maharashtra Real Estate Regulatory Authority (MahaRERA) has withdrawn its office order making land owners equally liable as that of builders and developers under the Real Estate (Regulation and Development) Act, 2016, the Bombay high court (HC) was told last week.

Advocate general Ashutosh Kumbhakoni told a division bench of justice Naresh Patil and justice Rajesh Ketkar that the authority has withdrawn the order dated May 1 by which it had introduced definition of the term “co-promoter” in the Real Estate (Regulation and Development) Act, 2016.

The office order defined co-promoter as the person or organisation, who under an agreement with the promoter (builder or developer) of a real estate project, is allotted or entitled to a share of the total revenue generated from sale of apartments in the project or in terms of constructed apartments in the project.

Kumbhakoni was responding to a petition filed by seven city residents, who own a 12,531 sqm plot at Nahur and who have given the land for development to a private developer, Shivkripa Enterprises.

 In the petition filed through advocate Vishwajeet Kapse they challenged validity of the office order primarily on grounds that the authority under RERA was not empowered to introduce any such new term into the enactment. “The impugned office order is tantamount to legislation,” stated the petition. “Respondent (MahaRERA) cannot legislate for the state, much less for the Union,” it added.

They took strong objection to the fact that the office order foisted a liability on land owners which was not contemplated either under provisions of the Maharashtra Ownership of Flats Act or under provisions of the RERA, 2016.

They said the authority under RERA failed to appreciate that the land owner, who is not himself the developer, does not undertake any construction activity and only parts with his rights as owner of the land to the builder or developer (promoter under RERA) to develop the land, and he has no further role to play in construction of the apartments and their sale to individual purchasers.

They withdrew the petition last week after Kumbhakoni made a statement to the effect that the office order has been withdrawn.

Source HT

Home buyers claim Jaiprakash Associates diverted over Rs 10,000 crore from Jaypee Infra

Jaypee Infratech has spent a minimum amount of Rs 13,283 crore towards the construction and development of the Yamuna Expressway, which translates to an amount of Rs 80.50 crore per kilometer

Home buyers claim Jaiprakash Associates has diverted over Rs 10,000 crore from its subsidiary Jaypee Infratech, which is under insolvency, in construction of Yamuna Expressway and other real estate projects.

In a new application filed by law firm Trilegal in the Supreme Court today on the basis of a report by accountancy firm ASA Financial Services, around 2,400 home buyers of Jaypee Wish Town project in Noida asked for forensic audit of accounts of Jaypee Infratech and Jaiprakash Associates, claiming that Jaiprakash Associates has transferred the land bank of Jaypee Infratech for settling its loans without adequate provisions and used its land bank as a security for getting loans.

According to the ASA report, Jaypee Infratech has spent a minimum amount of Rs 13,283 crore towards the construction and development of the Yamuna Expressway, which translates to an amount of Rs 80.50 crore per kilometer. However, the report compares the expenditure with an amount of Rs 17.16 crore per kilometer, which translates to Rs 34.32 crore per kilometer after indexing for inflation as per the consumer price index, spent on constructing a comparable six-lane concrete Mumbai-Pune Expressway.

Thus, the report finds that Jaiprakash Associates might have received an excess payment of about Rs 46.18 crore per kilometer for the construction of the Yamuna Expressway, which totals to about Rs 7,500 crore for the 165-kilometer Yamuna Expressway.

The report also finds that Jaiprakash Associates likely to have have overbilled at least Rs 3,000 crore to Jaypee Infratech for construction and development of the later’s real estate projects.

Jaypee Infratech in financial year 2015-16 gave 967 acres of land as security for Rs 33,000 crore loan taken by Jaiprakash Associates, and transferred 476.29 acres of land worth Rs 2,647.24 crore to the lenders of Jaiprakash Associates to settle its liabilities.

An email sent to Jaiprakash Associates didn’t elicit a response until the publication of this report Monday.

Devendra Yadav, a member representing nine association of Jaypee Infratech’s Wish Town projects urged the Supreme Court to direct Jaiprakash Associates to deposit Rs 15,000 crore, instead of Rs 2,000 crore ordered earlier. “We also demand a CBI enquiry for this scam, so that next time nobody can loot public money like this,” he said.

Home buyers had appointed ASA to undertake diligence of publically available accounts of Jaypee Infratech.

The Allahabad bench of the NCLT classified Jaypee Infratech, a subsidiary of Jaiprakash Associates, as insolvent on August 9 on a petition filed by IDBI Bank under the Insolvency and Bankruptcy Code 2016. Jaypee had defaulted on a Rs 526 crore loan by the bank.

The Supreme Court on September 11 had asked Jaiprakash Associates to deposit Rs 2,000 crore by October 27 to pay off the aggrieved home buyers.

The builder had requested the Supreme Court that it wants to sell off the Yamuna Expressway to generate money, and has an offer in hand for Rs 2,500 crore. The apex court, however, denied permission to sell off Yamuna Expressway, while extending the time to deposit Rs 2,000 crore as per its earlier order till November 5.

However, on the company’s failure to deposit the money on time, the apex court has now directed all the directors, except institutional ones, to be personally present in the next hearing on November 22, while also asking them to disclose their personal assets.

Jaiprakash Associates has now asked its employees to contribute towards arranging the Rs 2,000 crore, which will be returned in nine equal installments starting January 2018.

Meanwhile, the interim resolution professional (IRP) appointed in the Jaypee Infratech insolvency case, received around 18 expression of interests (EOIs) from the likes of steel, energy and cement conglomerate JSW Group, metals and commodities giant Vedanta, Mumbai-based builder Lodha Group, Deutsche Bank, etc, to buy Jaypee Infratech in full or in part.

Source – ET

MahaRERA orders Neptune to give home buyers flats in other wings

The Neptune 100 Above Buyers’ Welfare Association, set up by 53 home buyers who had booked apartments in Neptune Eleve’s B wing in Kanjurmarg in suburban Mumbai

In a first ruling on a complaint filed by an association of home buyers, Maharashtra Real Estate Regulatory Authority (MahaRERA) has directed Neptune Ventures and Developers Private Limited, which failed to give promised possession of flats in B wing of Neptune Eleve project in Kanjurmarg in 2014, to shift the flat buyers to flats in C and D wing, which are likely to be completed earlier. So far, the Maha- RERA had given orders on individual complaints only.

The Neptune 100 Above Buyers’ Welfare Association, set up by 53 home buyers who had booked apartments in Neptune Eleve’s B wing in Kanjurmarg in suburban Mumbai, had filed a complaint with MahaRERA that despite paying 10 to 30 per cent of the flat cost between 2010 and 2012, the developer had entered into registered agreements and had failed to give possession promised in 2014.

During the first hearing of the matter last month, the developer Neptune Ventures and Developers Private Limited had sought time to settle the matter amicably with the buyers. At the second hearing, the developer said that after discussions with the buyers, he had agreed to shift all 53 buyers to Neptune Eleve’s C and D wings which are likely to be completed earlier than the remaining wings in the project.

The association members agreed to option given by the developer withfour conditions. They demanded that the developer should not demand any fees for transferring their flat to a higher floor. They also demanded that the promoter should charge the money as per the subvention scheme he had advertised, and not impose additional costs.

They also demanded that the input credit on GST paid should be passed on to the association when the money comes to the promoter’s account, and that the developer should prepone his revised possession deadline from December 31, 2025 put on the MahaRERA website to June 2021.

MahaRERA adjudicating officer and chairperson Gautam Chatterjee then directed the developer to shift the home buyers’ flats to C and D wing of Neptune Eleve, and asked him to execute and register the agreements for sale as per RERA provisions before effecting any payments from them. He also directed that the future payment schedule should also be in accordance with the model form of agreement prescribed by RERA. As per the model agreement, the developer has to place 70 per cent of the project cost in an escrow account, and withdraw funds for the project in line with the construction schedule with the requisite certification by the structural engineer, the chartered accountant, and the architect.

Chatterjee also directed the developer to handover possession of the apartments by June 31, 2021 failing which the developer would be liable to pay interest to the buyers from July 2021 till the actual date of possession on the entire amount paid by the buyers. He also directed that the developer should not charge any extra money for floor rise if the buyers are shifted within 4 floors of the originally allotted floor or if shifted to a higher floor due to non-availability of apartments in Wings C or D. He also directed the developer to pass on the GST input credit to the home buyers after it is credited to the promoter’s account.

Source – Mumbai Mirror

‘Price of flat not relevant in case of claim for refund’

Ruhi Seth had booked an apartment in a housing projected to be constructed by Ireo Grace Realtech, a private construction company. Out of the total agreed consideration of Rs 1,84,44,568, Seth had paid Rs 33,56,942.
When the builder sent the draft of the agreement, Seth objected to certain clauses, refused to sign the agreement and sent it back to the builder, who revised the agreement, which too was not accepted. So Seth refused to pay further instalments till the dispute about the agreement clauses was resolved. Taking umbrage, the builder cancelled the flat allotted to her, and forfeited the entire amount paid by Seth.
Seth filed a complaint before the Delhi State Commission seeking a refund of the amount of Rs 33,56,942 paid by her together with interest amounting to Rs 34,24,081 computed at 24% per annum from Match 20, 2013 till May 20, 2017. She also claimed compensation and costs. The sum total of all the relieves claimed under various heads came to Rs 73,81,023. The state commission referred to the National Commission’s judgement in Ambrish Kumar Shukla & Ors versus Ferrous Infrastructure Pvt Ltd case and observed that the aggregate value of refund claimed and the value of the flat would exceed state commission’s pecuniary limit of Rs 1 crore. So it asked for filing of case before the appropriate forum having jurisdiction.

Seth then filed the same complaint before the National Commission The National Commission stated that the value of the flat would have to be added only when the complaint is in respect of possession, construction, or defects in a flat. Since Seth’s dispute was restricted to the claim for refund of the amount along with interest, compensation, and costs.
Accordingly, by its judgement on November 13 delivered by Prem Narain, the Commission concluded that the claim for refund of the deposit along with interest, compensation and costs aggregating to Rs 73,81,023 was below its pecuniary jurisdiction and would have to be adjudicated by the state commission. The National Commission asked Seth to a fresh complaint or revive her earlier complaint before the Delhi State Commission.
Source – TOI

‘Price of flat not relevant in case of claim for refund’

Ruhi Seth had booked an apartment in a housing projected to be constructed by Ireo Grace Realtech, a private construction company. Out of the total agreed consideration of Rs 1,84,44,568, Seth had paid Rs 33,56,942.
When the builder sent the draft of the agreement, Seth objected to certain clauses, refused to sign the agreement and sent it back to the builder, who revised the agreement, which too was not accepted. So Seth refused to pay further instalments till the dispute about the agreement clauses was resolved. Taking umbrage, the builder cancelled the flat allotted to her, and forfeited the entire amount paid by Seth.
Seth filed a complaint before the Delhi State Commission seeking a refund of the amount of Rs 33,56,942 paid by her together with interest amounting to Rs 34,24,081 computed at 24% per annum from Match 20, 2013 till May 20, 2017. She also claimed compensation and costs. The sum total of all the relieves claimed under various heads came to Rs 73,81,023. The state commission referred to the National Commission’s judgement in Ambrish Kumar Shukla & Ors versus Ferrous Infrastructure Pvt Ltd case and observed that the aggregate value of refund claimed and the value of the flat would exceed state commission’s pecuniary limit of Rs 1 crore. So it asked for filing of case before the appropriate forum having jurisdiction.

Seth then filed the same complaint before the National Commission The National Commission stated that the value of the flat would have to be added only when the complaint is in respect of possession, construction, or defects in a flat. Since Seth’s dispute was restricted to the claim for refund of the amount along with interest, compensation, and costs.
Accordingly, by its judgement on November 13 delivered by Prem Narain, the Commission concluded that the claim for refund of the deposit along with interest, compensation and costs aggregating to Rs 73,81,023 was below its pecuniary jurisdiction and would have to be adjudicated by the state commission. The National Commission asked Seth to a fresh complaint or revive her earlier complaint before the Delhi State Commission.
Source – TOI

Another bid to put Mumbai’s Wadala-Thane Metro-4 line on track

The MMRDA had to scrap tenders floated earlier this year as the bids were 25% more than the estimated cost of the project

After scrapping bids earlier this year, the Mumbai Metropolitan Regional Development Authority (MMRDA) invited bidders for five packages worth Rs2,700 crore for the Metro-4 line (Wadala-Thane-Kasarvadavali) on Sunday.
Despite a nod from the state in 2016, the line has faced delays in the awarding of contracts. The MMRDA had to scrap the tenders floated earlier this year, as the bids were 25% more than the estimated cost of the project.
A senior official from MMRDA said: “We floated nine packages for Metro-4 and Metro-2B together, resulting in bids that were 25% higher. When we separated the two projects, like in the case of Metro-2B, and floated tenders for a few packages, we received bids that were just 8% higher. We will follow it in every bid.”
The 32.32-km Wadala-Ghatkopar-Thane-Kasarvadavali Metro, which is estimated to cost Rs14,549 crore, will connect Wadala in central Mumbai and the neighbouring Thane district.

According to MMRDA, the Metro corridor will lead to development around the alignment. The corridor will provide another north-south rail connectivity and reduce the burden on suburban rail network.

Meanwhile, the planning authority has floated tenders for civil construction work of two packages for the Metro 2B corridor (Bandra Kurla Complex-Mandale) on Sunday.
The two packages worth Rs800 crore approximately are for design and construction of 11 elevated stations along the corridor.
Recently, the planning authority opened financial bids for 11 of the 22 stations, with the lowest bidder being Simplex Infrastructure Limited. Officials said the work contract will be awarded to Simplex after an approval from MMRDA’s executive committee.

Another bid to put Mumbai’s Wadala-Thane Metro-4 line on track

The MMRDA had to scrap tenders floated earlier this year as the bids were 25% more than the estimated cost of the project

After scrapping bids earlier this year, the Mumbai Metropolitan Regional Development Authority (MMRDA) invited bidders for five packages worth Rs2,700 crore for the Metro-4 line (Wadala-Thane-Kasarvadavali) on Sunday.

Despite a nod from the state in 2016, the line has faced delays in the awarding of contracts. The MMRDA had to scrap the tenders floated earlier this year, as the bids were 25% more than the estimated cost of the project.

A senior official from MMRDA said: “We floated nine packages for Metro-4 and Metro-2B together, resulting in bids that were 25% higher. When we separated the two projects, like in the case of Metro-2B, and floated tenders for a few packages, we received bids that were just 8% higher. We will follow it in every bid.”

The 32.32-km Wadala-Ghatkopar-Thane-Kasarvadavali Metro, which is estimated to cost Rs14,549 crore, will connect Wadala in central Mumbai and the neighbouring Thane district.

According to MMRDA, the Metro corridor will lead to development around the alignment. The corridor will provide another north-south rail connectivity and reduce the burden on suburban rail network.

Meanwhile, the planning authority has floated tenders for civil construction work of two packages for the Metro 2B corridor (Bandra Kurla Complex-Mandale) on Sunday.

The two packages worth Rs800 crore approximately are for design and construction of 11 elevated stations along the corridor.

Recently, the planning authority opened financial bids for 11 of the 22 stations, with the lowest bidder being Simplex Infrastructure Limited. Officials said the work contract will be awarded to Simplex after an approval from MMRDA’s executive committee.

RERA has revived home sector demand

SBI is seen to be among the major gainers from the government’s move to inject equity into state-run banks to enable them to lend more and spur economic activity. In an interview with TOI, Rajnish Kumar, the newly-appointed chairman of the country’s largest bank, talks about signs of change in the economic situation and expects a pick-up in demand after Tuesday’s Rs 7-lakh-crore package for the road sector. At the same time, he says, the bank may reduce interest rates in some basket, given the low credit demand. Excerpts:The government announced a major recapitalisation plan on Tuesday. What is your fund requirement?

We will work out our numbers and estimate the capital requirement. But we are better than the Basel III estimate. Given that we account for one-fourth of the banking system, I am sure the government will prioritise our requirement.

The government has also talked about monetisation of non-core assets. What is your plan, including on the real estate assets?

That programme will continue. It’s a separate exercise.Our properties will be handled by SBI Infrastructure Management but hiving it off is not a very tax-efficient option and there are complications.

How do you see the overall economic situation?

The India story remains intact, which is a view that is shared by everyone. There is no real slowdown in con sumption. In manufacturing sector, things can be better.But the government’s announcements for the infrastructure sector will give a major boost to employment and given the linkages with other sectors, higher government spending will help a lot of industries. I see major gains for cement and steel. Higher manufacturing activity may not see as much increase in jobs as in the past due to automation, which has reduced the employment potential. But more construction will mean more employment and the sector will have a cascading effect on other sectors.

Given the slowdown in growth and inflation remaining below 4%, do you expect RBI to cut rates?

We don’t see an immediate reduction in rates, especially in the December review.

Is there scope for banks such as yours to reduce deposit rates and also lending rates, especially for housing and other retail loans?

It will depend on individual banks. But given that credit growth is muted, there is scope for some further reduction in interest rates in certain baskets. While the overall decision will be taken by the assetliability committee, but some changes may happen.

One of the problems for low demand for loans is over-capacity in the system. Have you seen an improvement in the situation?

There is a problem in sectors such as power, where a lot of capacity is idle or under-utilised. The demand for loans from generation projects is not there. In other sectors such as steel, there is a balance between production and consumption. There will be more demand from the engineering sector in the coming months and I also expect demand from defence production and railways. With the latest thrust on infrastructure, the investment cycle will pick up. Automobiles are doing well with car sales being strong and light commercial vehicles also doing well. There was some disruption due to RERA but now all developers are marketing RERA-approved projects, which has reduced the trust gap between the buyer and the builder. Now buyers feel assured and the residential sector demand has revived. The thrust on affordable housing is also positive for the sector. These are pointers to things turning around (in the economy).

The finance minister spoke about indiscriminate lending between 2008 and 2014, creating problems for banks. Going forward, how do you prevent that?

When we do business, the risk management department has to be very strong, something that is a focus for us. We need to strike a balance between business growth and the risk appetite. Pricing of risk is a very crucial element. In the past, the problem was excess liquidity, which meant that pricing of the risk was not proper. If the risk is higher, then the reward has to be adequate. Due to higher liquidity , everyone was chasing few assets and the risk was underpriced. We need to get the riskreward framework right and the anxiety for growth should not upset that.

GST is seen to have created pressure on SMEs. What is your feedback?

The steps announced by the government should help clear some of the problems as most of them have concerns related to timely realisation of receivables. The move for electronic registration of public sector companies will help clear the dues of MSMEs on time. I hope the private sector also responds in a similar fashion.

Source – TOI

ACT PROTECTS HOME BUYERS – Booking amt capped at 10% under RERA: PM

rotecting home buyers’ interest and their life time savings is one of the top priorities of government, PM Narendra Modi said. He added prior to the enactment of real estate regulation law consumers waited for years to get possession of their homes as they would fall prey to unscrupulous builders.“There used to be ambiguity regarding the area of the flat. Now after Rera, only registered developers can seek bookings only after getting all the required permissions. Moreover, booking amount has been fixed only at 10%,“ The Prime Minister said. He added earlier builders would go to the extent of taking up to 50% as advance amount.

Section 13 of Rera specifies that no builder shall accept amount more than 10% of the cost as an advance payment or an application fee without first entering into a written agreement for sale and register the said agreement for sale.

Modi said builders now need to keep 70% of the payment received from buyers in an escrow account and this amount will be spent on that project only.

 Source – TOI